Projects - Schools

  • The Bureau of Indian Affairs
  • Sherman Indian High School

    Lopez Engineering, Inc. (LEI) subcontractor to Dyron Murphy Architects (DMA) provided construction administrative services to the Sherman Indian High School (SIHS) in Riverside, CA. The high school... read more

  • University of New Mexico
  • Gallup Campus Electrical Site Utilities Evaluation

    Perform electrical systems condition assessment survey of the site utilities for the University of New... read more
  • California Polytechnic University
  • Cal Poly ASI Student Center Audit

    Walk Through Energy Audit for Student Union Building. Identified Energy Conservation Measures (ECMs) to save ... read more
  • University of New Mexico
  • University of New Mexico Science and Technological Park Condition Assessment Survey

    Perform electrical systems condition assessment survey of potential University of New Mexico building, approximately 150,000sq.ft. S... read more
  • Machado Elementary School
  • Machado Elementary School Additions

    Developed classroom and infrastructure additions/extensions for the Machado Elementary School in Lake Elsinore, California. As w... read more
  • Laguna Department of Education
  • Laguna Middle School Health Center

    Lopez Engineering was contracted by the Laguna Department of Education to provide electrical design and construction administration... read more
  • Albuquerque Public Schools Board
  • Design Build for NW Middle School

    Lopez Engineering (LEI) was contracted to develop, in conjunction with Albuquerque Public Schools Board, performance specifications for a future design ... read more

See Our Projects

Schools

San Diego Office:
1501 Morena Blvd.
San Diego, CA. 92110
(P): 619-275-5658
(F): 619-275-192

New Mexico Office:
4700 Lincoln Road. NE, Suite 101
Albuquerque, NM. 87109
(P): 505-342-6223/6220
(F): 505-761-3105

© 2009 Lopez Engineering, Inc. All rights reserved
San Diego Web Design by: Dog and Rooster, Inc.