Our Team - Yzzer Roman
Yzzer Roman
Junior Designer/AutoCad DrafterEmail: yroman@electricalengineering.com
Years of Experience: 5 years
Education:
- B.S., Mechanical Engineering, San Diego State University (currently enrolled)
- Autonomous University of Baja California (UABC), Mexico, Physics Undergraduate
Experience Summary:
CAD drafting for electrical, security, public address, lighting, facilities planning, details, and schematics.
Current/Recent Projects:
San Diego International Airport, Lindbergh Field. Gates 1 and 2 Conversion-San Diego, California
Drafter and Junior Designer for the electrical (lighting and power), public address, special systems (telephone, EVIDS, and Southwest Airlines infrastructure), and security (Airport Authority Security and TSA Security) systems in Terminal 1 for Gates 1 and 2 at the Lindbergh Field in San Diego. The project recently finished construction. Construction cost $6,000,000 ($1,500,000 electrical portion)
San Diego International Airport, Lindbergh Field. Temporary Engine Generator Installation – San Diego, California
Drafter and Junior Designer for the installation and removal of seven (7) 2 MW temporary engine generators at the San Diego International Airport (SDIA) – Lindbergh Field. In order to limit outages to 12:00 midnight to 5:00 am, electrical cable type, electrical equipment such as fittings and box sizes and types were evaluated to determine how installation could be accomplished within the required time period. Construction cost was $2,000,000.
Imperial Beach Pier – Electrical Inspection and Refurbishment Report, San Diego, California
Drafter and Junior Designer. We replaced the existing lighting and installed new lighting. Upgraded electrical infrastructure to the lifeguard tower, pier restrooms, and to the Tin Fish Restaurant at the Pier’s End. We refurbished the gate access and redid the water valve to prevent water backup. Lighting calculations and construction administration. Construction cost was $277,000
Little Italy, San Diego, California
Drafter and Junior Designer. Designed according to San Diego City standards (construction documents). LEI was a subconsultant to Project Design Consultants, (PDC). The cost estimate $1500 a pole count pole). We did field work and removed the existing electrical system and installed a new electrical system and light fixtures. We performed voltage drop calculations and we removed 5 KV series city street lighting circuits. We are awaiting construction in 2006 at the end of design. The cost estimate was $300,000.
See Our Projects

San Diego Office:
1501 Morena Blvd.
San Diego, CA. 92110
(P): 619-275-5658
(F): 619-275-192
New Mexico Office:
4700 Lincoln Road. NE, Suite 101
Albuquerque, NM. 87109
(P): 505-342-6223/6220
(F): 505-761-3105
© 2009 Lopez Engineering, Inc. All rights reserved
San Diego Web Design by: Dog and Rooster, Inc.